ITB 18-002 LIFT STATION No 1 REPLACEMENT – 127 MIRACLE SRTIP PKWY SW, FORT WALTON BEACH, FL

It is the intent of this solicitation to secure a contractor to perform specified construction related to the installation of a new lift station wet-well within, above ground valve box, and associated gravity sewer main. The scope of services for this contract will be for all labor and materials needed to complete the work specified on the plan set the identified site. The extent of work is shown on the attached drawings and approved FDEP permit (Exhibits A & B).  PLEASE  SEE BID DOCUMENT FOR COMPLETE DETAILS.

Linked Document are underlined and in BLUE.

Bid Document – Bid Doc – FINAL – Posted October 12, 2017

Addenda – Addendum 1 – Posted October 17, 2017

Addenda – Addendum 2  – Posted October 30, 2017

Addenda – Addendum 3 – Posted November 6, 2017

Exhibit A – Plans – SP1701 Lift Station #1 (6pgs) – Posted October 12, 2017

Exhibit B – FDEP Permit 0312561-004-DWC-CG – Posted October 12, 2017

Exhibit C – Hotel plans (10pgs) – Posted October 30, 2017

Miscellaneous Documents

Pre-Bid Meeting – A non-mandatory Pre-Bid meeting is re-scheduled for 10:00AM local time on October 26, 2017 at City Hall Annex Bldg – Training Room, 105 Miracle Strip Parkway SW, Fort Walton Beach, Florida. SEE ADDENDUM  1 – Posted October 17, 2017

Bid Opening – November 9, 2017 – ( 2:30 PM Central Time) – City Hall Annex Training Room – Posted October 12, 2017;   REVISED TO NOVEMBER 14, 2017.

Bid Opening – Nov 14 2017 – Bid Opening Attendee Sign In Sheet – Bids Received – Posted November 15, 2017

Bid Tabulation

City Council Award