Fees

Fees

Construction Permit Fees:

Construction permit fees are based on the value of the work including labor, materials, site work, and design fees. No permit is required for cosmetic work only such as carpet, tile, painting, etc.

  • $501 to $50,000 – $39.00 for the first $1,000, plus $6.60 for each additional $1,000
  • $50,001 to $100,000 – $360.55 for first $50,000, plus $5.25 for each additional $1,000
  • $100,001 to $500,000 – $623.00 for the first $100,000, plus $4.00 for each additional $1,000
  • $500,001 and up – $2,219.00 for the first $500,000, plus $2.75 for each additional $1,000

General Fees:
General Fees include review fees, surcharges and other fees in accordance with F.S. 468.361 and F.S. 553.721.

  • Plan Check Fee – 50% of building fee
  • Building Permit Processing Fee – $22.50
  • Contractor’s Registration – $40.25
  • Certificate of Occupancy – $38.00
  • Certificate of Completion – $38.00
  • Demolition Fee – $59.50, plus $9.45 per 2,00 sf above 20,000 sf
  • Temporary CO – $270.50
  • Working Without a Permit Fee – 300% of permit fee, or $250, whichever is greater

Inspection Fees:

  • Threshold – $206.00
  • Additional Inspection – $38.00
  • Re-Inspection – $38.00 first and second. $115.50 three or more (each)

Click here for a comprehensive list of fees, including mechanical, electrical, plumbing, fire, water, and sewer fees.

The latest Fee Schedule was adopted by Resolution 2012-15 on 6/26/12.